Nordic Manufacturing Site
NMS-01 · 4 areas · 8 assets · 8 people · 20 linked records
PL2
Polymer Line 2
Batch polymerisation
- BR-204Jacketed batch reactor
- BR-205Jacketed batch reactor
Jens Müller · Jonas Lind · Henrik Sørensen · Sofie Nyberg
UTL
Utilities
Cooling water & transfer
- P-207Centrifugal pump
- CL-204Chilled-water loop + valve CV-204
Mette Dahl
MCH
Machining · Line 4
CNC machining
- CNC-75-axis machining centre
- CNC-118Horizontal machining centre
Frank Holm · Marco Vinter
ASM
Assembly & Molding
Molding, welding, inspection
- IM-310350 t injection molding machine
- RC-B6-axis robotic weld cell + VS-412 vision
Ali Rasmussen
Linked records
KB-204-032lesson2026-09-18 09:00 · Sofie Nyberg
Verify post-maintenance cooling response before next production run
BR-204 · Polymer Line 2 · links DEC-204-0917SOP-UPS-204
DEC-204-0917decision2026-09-17 15:42 · Henrik Sørensen
Cooling-loop inspection required before next run
BR-204 · Polymer Line 2 · links INV-204-0917
INV-204-0917investigation2026-09-17 14:52 · Henrik Sørensen
BR-204 temperature deviation investigation
SL-0917-Bshift-log2026-09-17 14:38 · Jonas Lind
Shift B: jacket felt warm, bypass valve opened manually
BR-204 · Polymer Line 2 · links EV-204-0917
ALM-204-55812alarm2026-09-17 14:37 · —
TEMP_DEV_HI · TT-204A 37.1 °C (target 34 °C)
BR-204 · Polymer Line 2 · links B-2026-0917
EV-204-0917event2026-09-17 14:37 · —
Temperature deviation · 7 min above range
BR-204 · Polymer Line 2 · links ALM-204-55812B-2026-0917
B-2026-0917batch2026-09-17 14:10 · Jonas Lind
Polymer resin A · step 4/7 exothermic hold
BR-204 · Polymer Line 2
ALM-RCB-2210alarm2026-09-17 13:02 · Ali Rasmussen
E-stop · servo axis 4 fault
RC-B · Assembly & Molding
WO-8812work-order2026-09-12 07:45 · Mette Dahl
Cooling-loop maintenance — CV-204 re-seated
CL-204 · Utilities · links CL-204-6
OBS-JM-031observation2026-09-02 10:15 · Jens Müller
“BR-204 recovers slowly after cooling-loop maintenance.”
DEV-IM-118deviation2026-08-30 22:40 · Ali Rasmussen
Short shots after mold changeover
IM-310 · Assembly & Molding
WO-88241work-order2026-08-21 11:20 · Frank Holm
Coolant filter replaced — spindle vibration
CNC-7 · Machining · Line 4
WO-8844work-order2026-07-15 10:00 · Mette Dahl
Coupling realignment
P-207 · Utilities
SOP-UPS-204procedure2025-06-01 00:00 · Henrik Sørensen
BR-204 start-up after maintenance (rev. 6)
BR-204 · Polymer Line 2 · links CL-204-6
CL-204-6procedure2025-06-01 00:00 · Mette Dahl
Cooling-loop return-to-service checklist (rev. 6)
CL-204 · Utilities
QR-2291deviation2025-03-12 14:05 · Sofie Nyberg
Slow recovery after CV-204 actuator swap — calibration not re-run
BR-204 · Polymer Line 2 · links WO-7984
WO-7984work-order2025-03-10 09:30 · Mette Dahl
CV-204 actuator replacement
CL-204 · Utilities
SOP-7-LOTOprocedure2025-01-10 00:00 · Marco Vinter
CNC-7 lockout/tagout
CNC-7 · Machining · Line 4
EV-1187deviation2024-11-06 15:20 · Sofie Nyberg
Slow cooling recovery after cooling-loop work
BR-204 · Polymer Line 2 · links WO-7710
WO-7710work-order2024-11-04 08:00 · Mette Dahl
Cooling-loop strainer clean + valve service
CL-204 · Utilities

A product of NeoFabrik / XRPK Solutions
NeoFabrik
CVR: 37261637
Løjtegårdsvej 97c, 1.74, 2770 Kastrup, Denmark
Phone: +45 20 53 32 51
NeoFabrik Brain v0.4_pilotPlant Status: Online