01Maintenance · SafetyLockout / Tagout (LOTO) on Press-3
Isolating all hazardous energy on a 400-ton press before a die change — electrical, hydraulic, pneumatic, and stored gravitational energy.
+
Lockout / Tagout (LOTO) on Press-3
Isolating all hazardous energy on a 400-ton press before a die change — electrical, hydraulic, pneumatic, and stored gravitational energy.
Isolating all hazardous energy on a 400-ton press before a die change — electrical, hydraulic, pneumatic, and stored gravitational energy.
- ›Which disconnects the expert touches, in what order
- ›Padlock and tag placement, serial numbers, who signs
- ›Residual-pressure bleed sequence and gauge reads
- ›Verbal try-start verification at the HMI
- 01Notify affected personnelLine lead + adjacent cell operators acknowledged on radio.
- 02Shut down via normal stop sequenceEnd-of-cycle, not E-stop, unless unsafe.
- 03Isolate all energy sourcesMain electrical disconnect, hydraulic pump breaker, pneumatic ball valve, ram safety block inserted.
- 04Apply personal lock + tag at each isolation pointOne lock per worker. Tag fields: name, date, reason.
- 05Release / bleed stored energyHydraulic accumulator to 0 bar, pneumatic header vented, capacitors discharged per drive manual.
- 06Verify zero energy stateAttempt normal start at HMI; meter test on motor leads; confirm ram cannot drop.
- ⎇If any gauge reads > 0 after 60s → stop, call maintenance lead.
- ⎇If a lock is already on a disconnect → add yours, do not remove the other.
- ⎇If task crosses shifts → outgoing worker's lock stays until incoming worker applies theirs.
02MachinistCNC spindle triage
Diagnosing vibration and thermal anomalies on grade-B aluminum before the part scraps.
+
CNC spindle triage
Diagnosing vibration and thermal anomalies on grade-B aluminum before the part scraps.
Diagnosing vibration and thermal anomalies on grade-B aluminum before the part scraps.
- ›Gaze pattern on chip color and shape
- ›Hand path to coolant filter and bearing housing
- ›Spoken preload thresholds and RPM ranges
- 01Pull and inspect coolant filterLook for fines; replace if loading > 30%.
- 02Re-run trial cut at 600 RPMListen for harmonic; temp sensor is unreliable below 800 RPM.
- 03Measure spindle bearing preload (µm)Use Frank's dial-gauge fixture, not the OEM jig.
- ⎇If preload > 12 µm → escalate to Marco; do not adjust.
- ⎇If chips turn blue → stop, coolant flow is insufficient.
03SetterInjection mold changeover (SMED)
Sub-15-minute changeover on Mold #214 including torque sequence, color purge, and first-shot validation.
+
Injection mold changeover (SMED)
Sub-15-minute changeover on Mold #214 including torque sequence, color purge, and first-shot validation.
Sub-15-minute changeover on Mold #214 including torque sequence, color purge, and first-shot validation.
- ›Tool order and grip on the cart
- ›Torque-wrench reads at each clamp bolt
- ›Purge color call-outs and shot counts
- 01Stage new mold + heated manifoldPre-heat to 65°C while old mold finishes cycle.
- 02Release clamps in star patternReverse of tightening order to avoid plate warp.
- 03Swap mold halves via overhead craneTwo-person lift; verify eye-bolt torque first.
- 04Torque clamp bolts to 95 Nm in star patternTwo passes: 50%, then 100%.
- 05Purge barrel until color is clean for 3 consecutive shots
- 06Run first-article and dimensional check
04Automation techRobot cell recovery after E-stop
Safe re-home and fault clearing on welding Cell-B after an emergency stop, without violating the safety interlock.
+
Robot cell recovery after E-stop
Safe re-home and fault clearing on welding Cell-B after an emergency stop, without violating the safety interlock.
Safe re-home and fault clearing on welding Cell-B after an emergency stop, without violating the safety interlock.
- ›Which HMI screens the expert opens, in order
- ›Jog directions, speeds, and end-effector pose
- ›Safety-gate reset sequence
- 01Confirm cell is clear of personnel and parts
- 02Acknowledge active faults on the safety PLC HMI
- 03Switch teach pendant to T1 (slow) mode
- 04Jog robot off the part and clear of fixtures
- 05Re-home using saved 'safe approach' macro, not the OEM home
- 06Re-arm safety gate and switch back to AUTO
- ⎇If torch is fouled → run wire-brush macro before homing.
- ⎇If a servo fault persists after 2 resets → page Marco; do not power-cycle.
05MaintenanceHydraulic leak isolation
Tracing pressure loss across a 6-valve manifold on Press-3 without shutting the whole line.
+
Hydraulic leak isolation
Tracing pressure loss across a 6-valve manifold on Press-3 without shutting the whole line.
Tracing pressure loss across a 6-valve manifold on Press-3 without shutting the whole line.
- ›Valve-by-valve walk and touch order
- ›Pressure-gauge reads at each tap
- ›Spoken elimination logic
- 01Read system pressure at the pump outlet
- 02Cap and test each branch one at a time
- 03Mark suspect valve with grease pencil
- 04Confirm by swap-test with a known-good valve
06QualityVision system re-teach
Re-training an inline inspection cell after a lighting or fixture change, without flooding the line with false rejects.
+
Vision system re-teach
Re-training an inline inspection cell after a lighting or fixture change, without flooding the line with false rejects.
Re-training an inline inspection cell after a lighting or fixture change, without flooding the line with false rejects.
- ›Reference-part placement and orientation
- ›Lighting and exposure tweaks
- ›Accept / reject calls on borderline parts
- 01Capture 20 known-good and 20 known-bad parts
- 02Re-balance lighting until histogram matches baseline
- 03Retrain classifier and review confusion matrix
- 04Shadow-run for 1 hour before going live
07Maintenance · SafetyConfined-space entry — degreaser tank
Pre-entry checks, gas testing, and rescue standby before sending a tech into the degreaser for filter replacement.
+
Confined-space entry — degreaser tank
Pre-entry checks, gas testing, and rescue standby before sending a tech into the degreaser for filter replacement.
Pre-entry checks, gas testing, and rescue standby before sending a tech into the degreaser for filter replacement.
- ›Gas-meter readings and probe placement
- ›Permit-to-work fields filled and signed
- ›Rescue-line and harness rig
- 01LOTO upstream solvent feed and ventilation power
- 02Purge with forced air for 15 minutes
- 03Gas test: O2, LEL, VOC at top, middle, bottom
- 04Standby attendant in position with comms
- 05Entrant dons harness, tethered to retrieval line
- 06Re-test atmosphere every 15 minutes during entry
- ⎇If O2 < 19.5% or > 23.5% → abort, re-purge.
- ⎇If LEL > 10% → abort, evacuate area.
08Training leadNew-hire week-one ramp
Curated playback of real skill files for an operator joining Line 4, with sign-off gates.
+
New-hire week-one ramp
Curated playback of real skill files for an operator joining Line 4, with sign-off gates.
Curated playback of real skill files for an operator joining Line 4, with sign-off gates.
- ›Which sessions to replay and in what order
- ›Decision points to pause on
- ›Sign-off criteria per skill
- 01Day 1: Safety + LOTO + confined-space replays
- 02Day 2: Line walk + machine-by-machine overviews
- 03Day 3: Shadow a veteran wearing the glasses
- 04Day 4: Supervised execution of 3 core skills
- 05Day 5: Sign-off by line lead
See a skill get built, step by step
The prototype walks through raw capture, extraction, and an agent executing the finished skill file.